Posts With Keyword ‘t-15’
Posted: Thursday, February 16th, 2012 at 6:25 am
The section of T-15 that runs over the Lake Red Rock Dam has reopened.
Read the rest of this entry »
Keywords: John Holt, Lake Red Rock, t-15
Posted: Wednesday, February 15th, 2012 at 6:29 am
T-15 over the Red Rock Dam is open.
Read the rest of this entry »
Keywords: John Holt, Lake Red Rock Dam, Road closures, t-15
Posted: Monday, February 6th, 2012 at 6:27 am
The Army Corps of Engineers has informed KNIA/KRLS News that T-15 over the Lake Red Rock Dam will be closing again on today.
Read the rest of this entry »
Keywords: John Holt, Lake Red Rock Dam, t-15
Posted: Sunday, February 5th, 2012 at 6:27 am
The Army Corps of Engineers has informed KNIA/KRLS News that T-15 over the Lake Red Rock Dam will be closing again on Monday.
Read the rest of this entry »
Keywords: Lake Red Rock Dam, t-15
Posted: Saturday, February 4th, 2012 at 6:27 am
The Army Corps of Engineers has informed KNIA/KRLS News that T-15 over the Lake Red Rock Dam will be closing again on Monday.
Read the rest of this entry »
Keywords: John Holt, Lake Red Rock Dam, t-15, U.S. Army Corps of Engineers
Posted: Saturday, January 28th, 2012 at 6:21 am
Friday the Army Corps of Engineers announced that T-15 over the Red Rock Dam would be re opening.
Read the rest of this entry »
Keywords: assistant ops manager john holt, Lake Red Rock Dam, t-15
Posted: Friday, January 27th, 2012 at 9:22 am
[simage=6616,400,y,center]
T-15 over Red Rock Dam will be reopening this evening.
Read the rest of this entry »
Keywords: John Holt, Red Rock Dam, Road closures, t-15
Posted: Sunday, January 15th, 2012 at 6:25 am
T-15 over the Red Rock Dam will be closing again.
Read the rest of this entry »
Keywords: Red Rock Dam, Road Closure, t-15
Posted: Wednesday, November 30th, 2011 at 6:29 am
[simage=6617,400,y,center]
T-15 Over the Dam will be opening today.
Read the rest of this entry »
Keywords: Red Rock Dam, t-15, U.S. Army Corps of Engineers
Posted: Wednesday, November 23rd, 2011 at 6:23 am
[simage=6616,400,y,center]
T-15 Over the Dam will remain closed through Thanksgiving.
Read the rest of this entry »
Keywords: Overhaul, t-15, Thanksgiving, U.S. Army Corps of Engineers
Posted: Saturday, October 22nd, 2011 at 6:29 am
Construction at Red Rock Dam is going well and Highway T-15 over the Dam should be reopen by the middle of November.
Read the rest of this entry »
Keywords: Lake Red Rock, t-15, U.S. Army Corps of Engineers
Posted: Thursday, May 19th, 2011 at 6:27 am
Drivers between Pella and Knoxville will need to plan for the possiblity of slight delays over the next week as crews continue surface resealing.
Read the rest of this entry »
Keywords: G-28 Resealing, t-15
Posted: Friday, February 4th, 2011 at 4:00 pm
[simage=4897,400,y,center]
The US Army Corps of Engineers has announced another closure of the bridge over the dam at Lake Red Rock.
Read the rest of this entry »
Keywords: dam bridge, Lake Red Rock, t-15, U.S. Army Corps of Engineers
Posted: Friday, January 21st, 2011 at 6:21 am
The U.S. Army Corps of Engineers has tentative plans to reopen county Highway T-15 between Knoxville and Pella sometime next week.
Read the rest of this entry »
Keywords: John Holt, t-15, us army corps of engineers at lake red rock
Posted: Wednesday, January 12th, 2011 at 6:27 am
A report is soon to be released outlining possible changes that can be made to County Highway T-15 between Pella and Knoxville.
Read the rest of this entry »
Keywords: highway, road, Roger Schletzbaum, t-15
Posted: Sunday, January 2nd, 2011 at 6:29 am
After reopening Highway T-15 at the Lake Red Rock Dam to allow the contractor to make slight design modifications, the U.S. Army Corps of Engineers has announced that the dam will close once again. Assistant Operations Manager John Holt tells KNIA/KRLS News that the dam will close Monday morning to continue work on the tainter gate lifting cables. Drivers will be rerouted to T-17 and G-46.
Keywords: closure, Lake Red Rock Dam, t-15
Posted: Sunday, December 12th, 2010 at 6:25 am
[simage=4558,400,y,center]
The U.S. Army Corps of Engineers has reopened Highway T-15 going across the Lake Red Rock Dam once again.
Read the rest of this entry »
Keywords: Lake Red Rock Dam, t-15
Posted: Thursday, December 2nd, 2010 at 6:29 am
For over a month work has been taking place on the Lake Red Rock Dam to repair the tainter gate lifting cables.
Read the rest of this entry »
Keywords: closure, Red Rock Dam, t-15