[simage=863,400,y,center]
With the draw down of Lake Red Rock well underway, work has began on the tainter gates of the dam to eventually replace the cables.
[simage=3047,400,y,center]
The U.S. Army Corps of Engineers at Lake Red Rock is releasing water from two of the dam’s five tainter gates, following another increase in the lake’s level on Sunday.